CACLA Engineering Limited

Your Trusted Partner In Electrical Solutions.

Welcome to CACLA Engineering Limited

About Company

Who We Are

Cacla Engineering Limited is a Tanzanian company established in August 2015 under the Companies Act, 2002. We are a Class 2 electrical contractor registered with the Contractors Registration Board (CRB) of Tanzania. Previously known as Cacla Investments Limited, we changed our name to Cacla Engineering Limited.

10+

Years In Business

10+

Happy Clients

20+

Major Projects Completed

Our Services

What We Offer

Petrol station lights

Electrical Installation

We offer electrical installation services for residential houses, factories, industries, mining operations, and commercial buildings.

Transformer Works

We provide supply, installation, and commissioning of 33KV and 11KV transformers. Additionally, we offer onsite transformer audits and maintenance services.

Close-up of an organized circuit breaker panel featuring color-coded electrical wiring.
Cable Management

We do supply and install cable management systems i.e cable trays and cable ladders with assorted accessories, Cable trunking and ducts together with covers. Cable trenches as well as underground cabling systems.

solar power, company, workers, installation, ecology, solar power, solar power, solar power, solar power, solar power
Solar Power Systems

We do survey, design, estimate, supply and install solar power systems including street lights, water pumps etc. in both commercial, domestic, Industrial areas as well as highways.

Additional Services

We Also Offer

Projects

Major Projects Completed

TOTAL ENERGIES TANZANIA

Supply and Installation of 11KV transformers and construction of HT and LV systems for 6 TOTAL Service Stations.

PSSSF MILLENIUM TOWER

Energy Meter Separation (Including construction of HT and LV lines, Supply, Installation and Commissioning of 11/0.4KV, 500KVA Transformer

PUMA Energy (T) LTD

Electrical Audit for PUMA Aviation Depots in DSM, Zanzibar, Arusha, Mwanza, Dodoma, Tabora and Songwe Airports

ORYX GAS (T) LTD

Electrical Audit of transformers of Oryx Gas Tanzania depots in Iringa, Dodoma, Moshi, Mwanza and Kigamboni.

BANK OF TANZANIA

Supply and Construction of Street Lights complete with hot dip-galvanized poles for Bank of Tanzania (Zanzibar)

Electrical Transmission and Distribution Company Limited

Supply of Earthing Materials for 10MVA substation at Stamigold Mine, Geita.

Our Clients

What Our Clients Say

Testimonials from Clients we have worked with.

5/5
Amandine Simonin

Operations Manager,
TOTAL Tanzania Limited

“Cacla managed very well their projects, they also give us good support on
maintenance whenever needed, they did a number of electrical audits with us and
their reports are always exhaustive”

4.5/5
Milan Jani

Country Procurement Manager, PUMA Energy Tanzania Limited

“I am very impressed with the report. Well done.”

5/5
Awadh Tamim

Operations Manager,
Impala Terminals Tanzania Limited

“Thank you for the extensive report. Much appreciating efforts and good quality
works”

Contact Us

Contact Our Offices

Offices

Head Office

Physical Address

P. O Box 35155
Mpakani Center (Former Higher Education Students Loan Board Ofice)
Suite No. F1.02
Plot 8 Block 46
Mwenge, Dar es Salaam

Phone: +255(0)767097768 | +255(0)713250038
Email: md@cacla.co.tz

Leave us a Message